La Rose du Lac 
ESTAVAYER-LE-LAC
The new "La Rose du Lac" project comprises 21 apartments ranging in size from 2.5 to 4.5 rooms, plus a 5.5-room penthouse.

Offering living areas ranging from 54 to 173 sq.m., the apartments are modern and designed to provide maximum comfort and convenience for their occupants.

The living areas are designed to be convivial, with large bay windows providing undeniable light. Whether it's a balcony or a terrace with garden, each apartment enjoys a spacious exterior that opens onto a calm, green environment.

A cellar serves each apartment. It is also possible to purchase an indoor parking space in the building's underground garage.
La Rose du Lac 
ESTAVAYER-LE-LAC

Construction

With a choice of finishes, you'll have the opportunity to add your own personal touch to your future home. Floor coverings are also available. The budgets allocated and the prices of the various materials are detailed in the technical construction specifications.

In addition, the buildings feature photovoltaic panels for a substantial contribution to the electricity grid. Heat and hot water production is provided by district heating.

Construction began in autumn 2022, and the homes will be delivered in 2024.

Conveniences

Neighbourhood
City centre
Green
Lake
Beach
Marina
Shops/Stores
Bank
Post office
Restaurant(s)
Railway station
Bus stop
Highway entrance/exit
Child-friendly
Nursery
Preschool
Primary school
Secondary school
Sports centre
Near a golf course
Tennis centre
Hiking trails
Museum
Concert hall
Hospital / Clinic
Doctor
Outside conveniences
Balcony/ies
Terrace/s
Garden
Quiet
Greenery
Public parking
Inside conveniences
Wheelchair-friendly
Lift/elevator
Underground car park
Open kitchen
Guests lavatory
Cellar
Bicycle storage
Built-in closet
Double glazing
Triple glazing
Bright/sunny
Equipment
Fitted kitchen
Connections for washing tower
Bath
Shower
Phone
Optic fiber
Internet connection
Electric blind
Interphone
Caretaker
Ventilation
Outdoor lighting
Floor
At your discretion
Tiles
Parquet floor
Condition
New
Style
Modern

Characteristics

Category
Projects
Reference
354
Year of construction
2022
Local tax
84 %
Property tax
2‰ of fiscal value
Availability
Fall 2024
Altitude (m)
450 m

Distances

Station
900 m
Public transports
230 m
Freeway
1.6 km
Primary school
520 m
Secondary school
240 m
Stores
300 m
Bank
400 m
Hospital
820 m

Contact for visiting

Mr. Olivier MARMIER